Solution
The required calculations are conveniently performed in the following
worksheet:
(1) (2) (3) (4) (5) (6) (7) (8) (9)
W
inj
=E
A
Q
i
/Q
iBT
Q
i
=S
w2
f
w2
W
inj
/W
iBT
(1) Eq. Table (4) df
w
/dS
w
Fig. Fig. Eq.
(assume) W
iBT
14-65 14-1 Q
iBT
= 1/Q
i
14-38 14-37 14-45
1.0 103,020 0.717 1.000 0.463 2.159 0.470 0.800 0.563
1.2 123,620 0.767 1.193 0.552 1.810 0.492 0.843 0.579
1.4 144,230 0.809 1.375 0.636 1.570 0.507 0.870 0.590
1.6 164,830 0.46 1.548 0.717 1.394 0.524 0.893 0.601
1.8 185,440 0.879 1.715 0.794 1.259 0.534 0.905 0.610
2.0 206,040 0.906 1.875 0.869 1.151 0.543 0.920 0.613
2.5 257,550 0.969 2.256 1.046 0.956 0.562 0.937 0.628
3.0 309,060 1.000 2.619 1.214 0.823 0.575 0.949 0.637
4.0 412,080 1.000 3.336 1.545 0.647 0.597 0.963 0.653
5.0 515,100 1.000 4.053 1.877 0.533 0.611 0.973 0.660
6.0 618,120 1.000 4.770 2.208 0.453 0.622 0.980 0.664
(10) (11) (12) (13) (14) (15) (16) (17) (18)
(N
p
)
newly
WOR
S
E
D
N
p
W
p
M i
w
Eq. Eq. Eq. Eq. Eq. Eq. Fig. Eq.
14-69 14-70 14-9 14-86 14-87 14-62 14-42 14-76
0.3056 1.5* 0.4173 47,027 0 0.400 0.800 0.91 244.9
0.2545 2.03 0.4387 56,223 9,604 0.430 0.860 0.94 252.9
0.2182 2.55 0.4533 63,716 21,223 0.450 0.900 0.96 258.3
0.1910 3.12 0.4680 70,816 33,303 0.480 0.960 0.98 263.7
0.1697 3.63 0.480 77,138 46,326 0.500 1.000 1.0 269.1
0.1528 4.24 0.484 81,400 61,812 0.510 1.020 1.02 274.5
0.1223 5.56 0.504 93,518 98,780 0.542 1.084 1.08 287.9
0.000 22.3
†
0.516 100,078 142,418 0.560 1.120 1.12 301.4
0.0000 31.2 0.5373 104,209 240,481 0.600 1.200 1.20 322.9
0.0000 43.2 0.5467 106,032 341,314 0.625 1.250 1.25 336.4
0.0000 58.8 0.5520 107,060 443,100 0.635 1.270 1.27 341.8
984 Reservoir Engineering Handbook
Reservoir Eng Hndbk Ch 14 2001-10-25 17:38 Page 984