project
was
enlarged
and
revised. Late
Shri V.
Ranganathan,
who
was
then Chief Engineer
incharge
of
the
project
was
responsible
for visualising the
project
in
its
present
form.
The Government
of
Canada agreed
to aid
the
construction
of
the
project
and appointed the
Canadian
Engineering
firm
of M/s
Surveyer, Nenniger
and Chenevert
fnc.,
as Consultants for
the
project.
During
the
pre-construction
studies made
by the
State
Electricity
Board and
the feasibility
studies
conducted
by
M/s Surveyer, Nenniger
and
Chenevert
Inc.,
the
scope
of the
project
was
revised and
enlarged.
This
resulted
in certain
modifications
to the
original
project
features relating
to reservoir
levels and
choice of
the structural
type. A
revised
Project Report
was
drawn up in 1966 and
this
was
finally
approved
by
the Planning
Commission.
An
aid
agreement
was
signed
between
the
Governments
of Canada
and
India
in 1967. The
consulting
engineers
were
assigned
the
engineering responsibility
in
respect
of
Idukki
Arch Dam,
pressure
shaft and
the
underground
power
house.
Brief
Description
of
the Project
The
qlojec^t
was planned
to
be
completed
in
two
stages.
_
The
lrst
stage
works
are
comple-te.
As
com-
pl.l.{
!t- .c9ns_is1s
of
three
major
dams,^viz.,
l6g.9l
rn
(q5l
fr)-high
Idukki
Arch
Dam,
138.38
'm
(454
ft)
n!g!
Cheruthoni
Concrete
Gravity
Dam,
gg.gl
;,
(328
.
ft)_
higb
Kulamavu
Masbnry-cum-Concrete
C-rqvj{V
_Dam
forming
the
two
billion
ionnes
capacity
Idukki Reservoir,
a water
conductor
system
consist-
ing
of 2027.53
m
(6,653
ft)
power
tunnel
and
a
pressure
shaft_ 993.34
m
(3,259
ft)
long
an under-
ground power
house
with
3
Nos.
i:O
MW
six
jet
pelton-wheels
installed.
The
tail-race
system of tunners
and
channels
er-r.y
the
Idukki
waters
after
power
generation
to
_
Valiar,
a
tributary
of
Thodupuzha
River in
the
Muvattupuzha
basin
(photo
l).
The
220
kV switchyard
which
is
overground
is
connected
to
the
power
house
by
two
cablJ
tunnels
which
accommodate
the
large
oil filled power
cables.
Th.
dpsigned
annual
power
generation
on
comple-
tion of
the first
stage
is
1,864
million
units
of
energy-
1.
Nachar
2.
R.C.C. Conduit
3. Access
tunnel
4.
Switchyard
5. Cable tunnel
6.' Tail-race tunnel
7.
Underground
power
house
Pressure shafts
^
Intermediate
adit
Penstocks
Butterfly valve
cbamber
Expansion
chamber
Surge shaft
Control
gate-head
race
tunnel
PHOTO
I
: Schemotic
profile-Idukki
Hydro-electric
project.
o
o.
9.
10.
11..
12.
13.
14.
Power
tunnel-Intake
torver
(Mornins
glory
type)
Kulamavu
Dam
Open
cut
channel
Idukki
Reservoir
Cheruthoni
Dam
Idukki
Arch
Dam
across
periyar.
15.
16.
17.
18.
19.
20.