(b)
FouNDArroN
Prszoruerens
The
tips had
been installed
by
drilling
holes to
a
maximum depth
of
24.4
m
and
located
in various
geological
strata which were of concern
from consi-
deration of seepage,
uplift,
etc.
Location
Number
of
Number
of
tips
tips
installed
functioning
satisfac-
torily
Station
22
+
55.5
m
Station
18
+
28.8 m
Station
14
+
32.6
m
Between
station
18
+
59.3
and 18
+
89.8
m
along
clay
shale
band
I A
(b)
HonlzoNrAl
MovrueNr
Internal
horizontal
movement
devices
have
been
installed
as
a
part
of
the
telescoping
vertical
movement
cross-arm
devices B,
C, D,
E,
F
and
G.
Horizontal
movement
of
plates
is
transformed
into vertical
move-
ment
by a linkage
system.
The
observations
of
these devices
so
far
have
revealed
nominal
changes
in
horizontal
strain
during
the
post-construction
period.
(c)
Sunrece
SeTTLEMENT
PorNrs
The
surface
settlement
points,
numbering
lO2,
consisting of
steel
rods
grouted
into
the sloping
surface
of
the
dam have
been
located
at different
elevations
along the
dam
slope
both
on
upstream
and down-
stream.
There
are
in all two
rows
of
such
embank-
ment
measurement points
provided
along
upstrearn
(El.
387.10
and
411.48 m)
and
four rows
along the
downstrearn
slope
(El.
434.95, 411.48,
387-10 and
362.7 |
1356.62
m).
Plates
of size
225
mm
X
75
mm
x
6
mna
for
measuring
settlements
have
also
been installed on
top
of
parapet
wall of dam.
The observations
for the
cumulative settlement
and deflection
on the
surface
settlement
points
have
been
made with
reference'
to
control targets/bench
marks.
These
observations
are within
permissible
limits.
Slope
Indicators
Slope
indicator
installations have been
provided
one
in
the
body
of
the
dam
at
about its maximum
section
to record
displacements within the embank-
ment
and
other
near
the
toe
of the downstream
toe
rveight
to detect horizontal
movement
and
settlement
of
rock below.
The observations
of these
instruments
have
revealed
no
significant
movement so far
during
the
post-construction
period.
(a)
Susrr,tlc AcrIvIrY
Seismic
studies
around Beas
Dam
Project and
Beas-Satluj
Link
Project
are carried out
by
the
India
Meteorological
Department"
Ten
seismological
obser-
vatories
have
been
established in
the area.
The
obser-
vations
recorded
have
not
yet
revealed
any
significant
correlation between the
seismic activitv
and
level
of
water
in
Beas
Dam
reservoir.
(b)
AccELERocRAPHS
Two strong motion
accelerographs, one at the
top
of dam
and
other near its dorvnstream
toe are also
under
installation.
5. CONCRETE
PRODUCTION
AND PLACEMENT
The appurtenant
structures
such
as
diversion
works, spillway,
irrigation outlets,
penstocks
and
8
l1
9
l8
l9
ll
28
53
Observations
of the
piezometers
so
far
indicate
that
the rate
of dissipation
of
pressures
in the
dam
foundation
is relatively
slow than
expected.
(c)
Ponous
TUBE
Prrzousrnns
Vertical
and
Horizontal
Movement
(a)
VrnucAL
Movsl\anNr
height
of
dam.
22r