396
Advanced
Blowout
and
IeN
Control
Momentum
Kill, 267-76
Mud
cross,
5
Multiphase Kill Procedure, 256-67
Noise
Log,
342,357
Offshore Well Control, 2
10-1
5
Choke Line Frictional Pressure
Fluctuations
in
Rates
and Volumes,
Reduced
Fracture
Gradient,
2 12
Trapped Gas, 2 14
Oil-Based
Mud,
200
Fire, 201
Solubility
of
Natural
Gas,
201
Loss,211
210
Panic Line, 16-17
Pipe
Buckling, 299
Elastic, Long-Column, 299
Inelastic
or
Local-Intermediate, 299
Poor
boy,
25
Proximity
Logging,
327
Recommended Practices
Relief Well Plan
Overview,
337-40
Relief Well
Planning
API
RP
14E, 8-9
Subsurface Distance, 333
Surface
Distance,
336
Reverse Circulation, 180-86
Rig
Assisted
Snubbing Unit, 283
Safety Factor, 46,137,154
Shallow
Gas
Kicks, 2 15
Shut-in Procedure, 32-35
SptM,
24-25
Hard
Shut-in, 34
Offshore, 209
soft
Shut-in,
34
While Tripping, 97
Slenderness
Ratio,
300
Column Slenderness Ratio, 300
Eff'ective Slenhess Ratio, 300
Slim Hole Drilling, 191
Snubbing, 278-99
Snubbing
Equipment,
281
Snubbing Procedure, 280
Snubbing Stack, 280
UnitDimensions, Capacities, 300
Stabbing Valve, 25-27
Stack,
4-5
Stripping, 100,195,278-99
Subsea Stack, 207
Survey
Instrument Reliability, 330
Swivel Joint, 11
Targeted
turns,
13
Temperature
Survey,
346
Trip Sheets, 86
Tripping
Continuous Filling
Procedure,
92
Periodic Filling
Procedure,
89
ULSEL,
319
Underbalanced drilling, 12
Underground
blowout, 21,341
Cement, Barite Plugs, 364
Offshore, 343
Shear
Rams,
364
U-Tube Model, 42,114,258
Valve
Arrangement,
16
Valves,
16
Ball, 16,23
Gate, 16,17
Safety, 16
Vent Wells, 362
Volumetric Kill
Procedure,
228-56
Wait
and Weight
Method,
61-67,83
WELLSPOT, 323
Y-Tube Model, 142