7
reservoir modelling, well drilling and workover planning, PVT analysis,
production forecasting.
Responsibilities of Drilling engineer: estimation of cost to access
reserves, geologic survey, estimation of the sought reserves value,
development of contacts with vendor, wellbore plan.
Exercise 12. Complete the sentences.
1. According to the survey published in December 2006 the average
income of a petroleum engineer in the world was $116, 834.
2. Deepwater operations can be compared to space travel in terms of
technical challenges.
3. Such modern technologies as horizontal drilling and enhanced oil
recovery have improved the toolbox of the petroleum engineer.
4. Petroleum engineering covers a wide range of topics including
economics, geology, geochemistry, geomechanics, geophysics, oil
drilling, geopolitics, knowledge management, seismology, tectonics
thermodynamics, well logging, well completion, oil and gas
production, reservoir development, and pipelines.
5. Petroleum engineers can be divided into several types: reservoir
engineers, drilling engineers, production engineers.
6. Two areas in which reservoir engineers usually specialize are
surveillance (or production) engineering and simulation modeling.
Exercise 13. Define true or false sentences. If true, add the information on
the statement. If false, correct the sentence.
1. Petroleum engineering covers a wide range of disciplines. – True
(additional information is in the 1
st
paragraph).
2. Operation in HTHP environment is a rare case for petroleum engineer
today. – False (information is in the 3d paragraph).
3. Petroleum engineers are usually well paid. – True (additional
information is in the 4
th
paragraph).
4. Petroleum engineers deal with oil field close to the Earth’s surface. –
False (information is in the 2
nd
paragraph).
5. Petroleum engineers are subdivided into two types. – False
(information is in the 5
th
paragraph).
6. Reservoir engineering is concerned with reservoir modelling. – True
(additional information is in the 7
th
paragraph).
7. Drilling engineers have to perform PVT analysis of the well. – False
(information is in 7
th
paragraph).