Table 9-3
Results of Example 9-14
Total Production Rate is 1500 STB/day
Time Oil Rate Water Rate Water Cut Cum. Oil Oil Rec.
days STB/day STB/day Fraction MSTB %
80. 742.1 757.9 0.505 67.98 1.56
260. 734.6 765.4 0.510 160.34 3.69
275. 727.1 772.9 0.515 171.31 3.94
290. 719.6 780.4 0.520 182.16 4.19
770. 541.8 958.2 0.639 481.00 11.07
785. 537.6 962.4 0.642 489.10 11.26
800. 533.5 966.5 0.644 497.13 11.44
1295. 423.5 1076.5 0.718 732.08 16.85
1310. 420.8 1079.2 0.719 738.42 17.00
1325. 418.1 1081.9 0.721 744.71 17.14
2060. 315.7 1184.3 0.790 1011.42 23.28
2075. 314.0 1186.0 0.791 1016.14 23.39
2090. 312.4 1187.6 0.792 1020.84 23.50
2105. 310.8 1189.2 0.793 1025.51 23.60
2120. 309.2 1190.8 0.794 1030.16 23.71
2135. 307.6 1192.4 0.795 1034.79 23.82
2705. 255.5 1244.5 0.830 1194.54 27.50
3545. 200.1 1299.9 0.867 1384.48 31.87
3650. 194.4 1305.6 0.870 1405.19 32.34
where
D
b
= distance between the WOC and the horizontal well
D
t
= distance between the GOC and the horizontal well
Q
oc
= critical oil rate, STB/day
r=density, lb/ft
3
k
h
= horizontal permeability, md
h = oil column thickness, ft
y
e
= half distance between two lines of horizontal wells
(half drainage length perpendicular to the horizontal well)
L = length of the horizontal well
q
*
c
= dimensionless function
618 Reservoir Engineering Handbook
Reservoir Eng Hndbk Ch 09 2001-10-25 08:37 Page 618