flow (continued )
piston pumps, 150, 151
pump initial conditions, 146
relief valves, 363
reversal, 302
307, 303
valve opening, 110
flow instabilities, 499
519
computations, 503
hydropower stations, 513
519
pumping systems, 501
507
remedial measures, 506
507, 512,
518
519
fluids
parameter, 27
28
flywheels, 159
172
advantages, 171
booster pumps, 170
case studies, 163
167
installations, 160, 161, 170
171
multi-pumps, 170
171
pipeline limitations, 162
163
Sharjah Pumping Station, 167
170
size limitations, 161
162
forces at pipe cross-section, 28
Fossdale service reservoir, 193, 195
free-acting modifications, 414
415
gas, 325
358
distribution, 58
59
envelope curves, 469
evolution, 339
340
fixed-grid computations, 57
influence on parameter, 32
38, 37
pipelines, 58
59, 340
343
pockets, 340
343, 341
rising mains, 345
351, 469
sewage mains, 345
351
gas charge/liquid level control, 217
218
gas volumes, 210, 342, 350
Geassa tower, UAE, 250
Glasgow East Main pumping system,
501
507, 502, 505
glass reinforced plastic (GRP) mains, 162,
463
464
Glenfield APEX valves, 307
Glenfield check valves, 417, 418, 436, 437,
439, 440
gradients see hydraulic gradients
graphical techniques, 177
178
gravity flow outlets, 281
gravity mains, 479
481
compression wave propagation, 100, 101,
103
envelope curves, 480, 512
flow system, 507
512
heads, 481
hydraulic conditions, 507
pump start-up, 480, 481
uniform, 100
105
grey cast iron, 9
10
Grove regulators, 369
371, 370, 371
GRP (glass reinforced plastic), 162, 463
464
H
Q performance curves, 131
H=N
2
vs. Q=N curves, 132
H1 valves, 509, 511
512
Haidaria project, 209, 210
hammering, 1, 361
HDPE see high-density polyethylene
head-loss coefficients, 71, 72
heads
3 min valve closure, 111
air valves, 293, 303, 304
305, 308
310,
309, 311, 312
pump restart, 314, 315
pump start-up, 331
small orifice, 316, 317
air-filled risers, 332, 334
area blackout, 495
booster pumping stations, 195, 197, 198,
506
break pressure chamber, 512
Burnside pumping stations, 506
Castlemilk Low, 505
check valve shutting, 389, 399
feeder tanks, 265, 266, 276, 278
gas volume increase, 350
gravity mains, 481
horizontal pipelines, 466
Lawhead/Silverburn rising main, 166
long rising mains, 147, 148
longer pipelines, 433
losses, 46, 508, 510
low-lift systems, 190
membrane plants, 246
needle valves, 120
121
Penn’s Hill, 223
pipe bursts, 485
pipeline after trip, 312, 313
polytropic coefficient, 183
pressure vessels, 184
pump start-up, 331, 337, 339, 348
booster pumping stations, 506
gravity mains, 481
pump trips, 484
comparisons, 349
350
composite system, 471
long main, 367
low-lift systems, 190
over 8s, 357
pipelines, 312, 313
relief valves, 368
Sharjah Pumping Station, 167
sleeve valves, 429, 430, 432
532
Pressure transients in water engineering