PROCESS EQUIPMENT IN PETROLEUM REFINING 919
Allow another 3 ft between reboiler inlet nozzle to bottom tray. This provides adequate
space for vapor separation from the high liquid level.
At the top of the column space must be provided between the top tray and the top vapor
outlet nozzle to accommodate the reflux return distributor and vapor disengaging from
the top tray. Let this be 8 ft from top tray to the tower top Tan line. Then
Total tower height:
From bottom Tan to Bottom tray = 19.0ft
The trayed section = 73.0ft
From top tray to top Tan = 8.0ft
Total = 100.0 ft Tan to Tan
These overall dimensions are now inserted on the vessel diagram as shown in Fig-
ure 18.11. An attached sheet will be included to give the nozzle description, size and
flange rating referring to those shown in the small circles on the sketch. A schedule
of flange ratings for carbon steel is given in Table 18.9.
The only other dimension that will be shown on the sketch is that of the Skirt. Now the
vessel is installed onsite supported by a metal skirt fixed to the concrete foundation
of the vessel. The height of this skirt is fixed by the following criteria. If the product
Table 18.9. Schedule of flange ratings for carbon steel
Flange ratings psig 300 400 600 900
Serv temp,
◦
F 150 Max operating pressures Psig
100 275 720 960 1,440 2,160
150 255 710 945 1,420 2,130
200 240 700 930 1,400 2,100
250 225 690 920 1,380 2,070
300 210 680 910 1,365 2,050
350 195 675 900 1,350 2,025
400 180 665 890 1,330 2,000
450 165 650 870 1,305 1,955
500 150 625 835 1,250 1,875
550 140 590 790 1,180 1,775
600 130 555 740 1,110 1,660
650 120 515 690 1,030 1,550
700 100 470 635 940 1,410
750 100 425 575 850 1,275
800 92 365 490 730 1,100
850 82 300 400 600 900
900 70 225 295 445 670
950 55 155 205 310 465
1,000 40 85 115 170 255