1350 INDEX
Bromine number, 1093
Bubble point, 1093
Burners, 1051, 1095, 1171
Capital cost estimates, 775
Capitalized construction period loan interest, 1132
Catalyst diesengagement, in FCC units, 253
Catalyst regeneration in FCC units, 256
Catalytic olefin condensation, 373
Catalytic reforming, 31, 55, 217, 1097
Caustic soda handling, 683
CCR, 218
Centrifugal compressor horsepower, 951
Centrifugal compressor specification, 968
Centrifugal compressor surge control, 963
Centrifugal compressors, 954, 1099
Centrifugal pump specification, 937
Centrifugal pumps, 924
Cetane number, 72
Chemical oxygen demand (COD), 613
Clean Air Act, 631
Cloud point, 8, 21, 73, 1102
CO boilers, 263
CO combustion, 263
Coke, 1103
Coking, 450, 1104
Cold flash separator, 1106
Component balances, 1106
Compressed air systems, 1074
Compressor drives, 989
Compressors, 954
Condensers, 1025
Condensers, shell-and-tube, 1107
Cone roof tanks, 534
Conradson carbon, 260, 1113
Continuous catalyst regeneration (CCR), 218
Control valve sizing, 606
Control valves, 528, 1113
Conversion factors, 1331
Cost estimating, 1115
Cost plus contracts, 807
Crude oil, 1117
Crude oil assays, 1308 to 1329
Cut point, 9, 1119
Cyclic reforming, 218
Dearomatization process, 1119
Deasphalting process, 487, 1120
Debutanizer, 1121
Deep catalytic cracking (DCC), 272, 458
Deethanizer, 1122
Delayed coking, 450
Depropanizer, 1122
Dew point, 1122
Dewaxing process, 492
Diesel fuel, 71
Diesel fuel specifications, 712
Diethanol amine (DEA), 421
Diglycolamine (DGA), 421
Dimersol process, 391
Discounted cash flow, 784, 851
Distillate hydrocracking, 287, 1124
Distillation, 1127
Drums, 908, 1128
Dubbs process, 374, 1268
Economic analysis, introduction, 851
Economic evaluations, 1131
Edmister correlations, 1134
Effluent water treating facilities, 565, 1135, 11
End point, 10, 1144
Engineering flow diagrams, 1144
Environmental control, 611
Equilibrium flash vaporization curve, 17, 1151
FCC catalysts, 268
Feed injection systems in FCC units, 250
Finished lube oil, 484
Fire foam systems, 701
Fire prevention and fire fighting, 695
Fired heater specification, 1058
Fired heaters, 1040, 1158
Fixed fee contracts, 807
Flares, 559
Flash point, 17, 29, 73, 718, 1160
Flash zone, 1161
Flexicoking, 452
Floating roof tanks, 535
Flow resistance of valves and fittings, 1300
Fluid catalytic cracking (FCC), 33, 56, 239, 1153
Fractionation, 1161
Fractionation towers, 878
Fractionation trays, 878
Friction loss for viscous liquids, 1291–1299
Fuel oil specifications, 713
Furfural extraction, 490
Furfural handling, 687
Gaps and overlaps, 1166
Gas oil, 58, 1167
Gas oil cracking, 250
Gas oil specifications, 711