n rotational speed (r.p.m.); period with simultaneous annual records of
precipitation depths and of flows depths over the watershed of the
stream-gauging station (-); time step index (-); polytropic coefficient
for the air behaviour inside a vessel
(-); number of the project lifetime
periods (generally measured in years).
N number of nozzles of a Pelton turbine(-).
N
f
free surface level in a forebay (m).
n
GS
period with records either of mean daily flows at the stream-gauging
station or of annual precipitation depths in rain gauges located inside
or near the station watershed (years).
n
HS
period with records of annual precipitation depths in rain gauges
located inside or near the hydropower scheme watershed (years).
N
noz
nozzle level (m).
n
o
nominal rotational speed (r.p.m.).
NPV net present value (cost unit).
Nres reservoir water level (m).
Nriver water level at downstream powerhouse (m).
Ns specific speed (r.p.m.).
O present value of the annual operation costs (cost unit).
Oi discharge over the spillway during time step i (m3/s).
Oj annual operation cost for year j (cost unit).
P annual precipitation depth (mm); installed power (kW); present value
of the reposition costs (cost unit).
p number of alternator pairs of polos (-).
γ
atm
p
atmospheric local head (m).
P
GS
i
precipitation depth over the watershed of the stream-gauging station in
year i (mm).
GS
P mean annual precipitation depth in the watershed of the
stream-gauging station (mm).
P
HP
i
precipitation depth over the watershed of the hydropower scheme in
year i (mm).
HP
P mean annual precipitation depth in the watershed of the hydropower
scheme (mm).
Pm reposition cost in year m (cost unit).
Po hydraulic linear growing power (kW).
Pt installed turbine power (kW).
PV present value (cost unit).