498
Drilling
and
Well
Completions
Drilling Mud Hydraulics
....................................................
.
..................
829
Rheological Classification of Drilling Fluids
829.
Flow Regimes
830.
Principle of Additive
Pressures
834.
Friction Pressure Loss Calculations
836.
Pressure Loss Through Bit Nozzles
839.
Air
and
Gas
Drilling
.............................................................................
840
Types of Operations
840.
Equipment
844.
Well Completion
847.
Well Control
852.
Air, Gas, and
Unstable Foam Calculations
853.
Downhole Motors...................
...............................................................
862
MWD
and
LWD
.....................................................................................
901
Turbine Motors
863.
Positive Displacement Motor
882.
Special Applications
899.
MWD Technology
901.
Directional Drilling Parameters
954.
Safety Parameters
961.
LWD
Technology
971.
Gamma and Ray Logs
971.
Resistivity Logs
974.
Neutron-Density Logs
985.
Measuring While Tripping: Wiper Logs
999.
Measurements at the Bit
1002.
Basic Log
Interpretation
1005.
Drilling Mechanics
1015.
Abnormal Pressure Detection
1036.
Drilling Safety,
Kick Alert
1067.
Horizontal Drilling, Geosteering
1070.
Comparison of LWD Logs with Wireline
Logs
1077.
Comparison of MWD Data with Other Drilling Data
1078.
Directional Drilling
..............................................................................
1079
Glossary
1079.
Dogleg Severity (Hole Curvature) Calculations
1083.
Deflection
Tool
Orientation
1085.
ThreeDimensional Deflecting Model
1088.
Selection
of
Drilling Practices
.............................................................
1090
Factors Affecting Drilling Rates
1090.
Selection of Weight on Bit, Rotary Speed, and Drilling
Time
1091.
Selection of Optimal Nozzle Size and Mud Flowrate
1097.
Well
Pressure Control
..........................................................
.
...............
1100
Surface Equipment
1101.
When and How to Close the Well
1101.
Gas-Cut Mud
1103.
The Closed
Well
1105.
Kick Control Procedures
1106.
Maximum Casing/Borehole Pressure
11 11.
Fishing Operations and Equipment
...................................................
1113
Casing and Casing String Design
........................................................
1127
Causes and Prevention
1114.
Fishing Tools
11 15.
Free Point
1124.
Types of Casing
1127.
Casing Program Design
1128.
Casing Data
1132.
Elements
of
Threads
1141.
Collapse Pressure
1147.
Internal Yield Pressure
1155.
Joint Strength
1156.
Combination Casing
Strings
1157.
Running and Pulling Casing
1164.
Well Cementing
...................................................................................
1177
Cementing Principles
1179.
Properties of Cement Slurry
1183.
Cement Additives
1193.
Primary Cementing
1200.
*Diameter Casing Cementing
1211.
Multistage Casing
Cementing
1216.
Secondary Cementing
1223.
Squeeze Cementing
1224.
Plug Cementing
1228.
Tubing and Tubing String Design
.......................................................
1233
API Physical Property Specification
1233.
Dimension, Weights, and Lengths
1233.
Running
and Pulling Tubing
1239.
Selection of Wall thickness and Steel Grade
of
Tubing
1251.
Tubing
Elongation/Contraction
1252.
Packer--Tubing Force
1254.
Permanent Corkscrewing
1257.
Corrosion and Scaling
.........................................................................
1257
Corrosion Theory
1259.
Forms
of
Corrosion Attack
1268.
Factors Influencing Corrosion
Rate
1292.
Corrodents in Drilling Fluids
1300.
Corrosion Monitoring and Equipment Inspec-
tions
1312.
Corrosion Control
1323.
Recommended Practices
1340.
Environmental Considerations
.........................
. .
.
.............................
..
.1343
Offshore Operations
............................................................................
1363
References
............................................................................................
1373
Site Assessment and Construction
1344.
Environmental Concerns While in Operation
1352.
Drilling Vessels
1357.
Marine Riser Systems.
1359.
Casing Programs
1361.
Well Control
1363.