The gallery
and
cut off wall were constructed by ar interesting method as mentioned
below.
For
preparation
of
working
afterwards, a
vertical
shaft
was
provided
at
nearly
center position
of the cut off
wall
section.
This
was uesed to
carry out the excavation spoil or
take into
the
materials
during
construction. Then,
excavation
of
the
Sallery
started at the bottom in the
shaft and
went on to left and dght along
the dam axis.
Follon'ing the
galtery,
4m in hight
above
the top of the
gallery
was cut down into that. After excavation, concrete
placement
was made
to
com-
Plete
the
gallery
and also a lower half
of 4m high
vacancy was filled with
concrete which formed
the lowest
part
of the
cur-
tain wall.
Another 2m vacancy remained
above was used
to
proceed
to
the next work
of the wall. Namely,
excavation
and
concrete
placement
was
getting
on altemately
with
2m step
upwords.
The excavation
spoil was
gathered
to the shaft
to carry out
ftom the ground,
and H-type
piles
ang sheet
piles were
used as supporte$ against
earth
pressure.
Hvd
s
Lil1
TYPICAL
CROSS
SECTION
(OVBRFLOW
SECTION)
ilL- O
TYPICAL CROSS SECTION
(ROCK
FrLL
SECTTON)
Sub Dom
C
Exowlion Line
3
Inspetim Gollery
3 core
'3
frller
'3
Tronsilim
0
Rmt
0
Cmcrete Fill
€ Curloin Groting
\\
\\
t\
25