EN 13941:2009 (E)
Compaction: The friction coefficients of the material are based on a standard proctor value, average 97-98%. No values below 94-95%.
Careful and even compaction is required.
The subsequent backfilling of the pipe trench shall comply with the instructions for e.g. road building.
The compression zone, i.e. the room between pipeline zone and upper (e.g. road) construction shall be made from
such a material and in such a manner (by layers) that the requirements made by the structures above the pipeline
are fulfilled. Unsuitable material, e.g. stone and rocks, shall not be used. The upper construction zone, i.e. the room
between compression zone and surface, shall be backfilled according to the instructions given by the authority
responsible for the surface.
Application rule:
To reduce the risk of pipe damage by third parties it is recommended to use warning tapes, referring to the pipeline.
The warning tape shall be placed at a distance of approx. 0,2-0,5 m above the district heating pipeline.
7.9 Pipe bends and other components
7.9.1 Pipe bends
Un-insulated pipe bends shall be installed (fitted and insulated) as specified.
Application rule:
Examples of such bends are bend fittings and specially designed bends, e.g. bridges and chambers.
Special attention shall be paid to the dimensions, the installation and also the trench enlargement necessary to
allow the bends (legs) to expand.
During the final inspection of the bend zone in particular, prior to backfilling, the pipeline position, thickness and
length of expansion pads shall be checked to ensure that they conform to the installation plan.
The actual value of the expansions and other important pipeline measurements shall be determined prior to
backfilling.
7.9.2 Branches
Un-insulated tees for branch lines and other types of branches shall be installed (fitted and insulated) according to
the system instructions.
Application rule:
Examples of such branches are branch saddles with bend fittings and other special constructions.
In the case of branches, be especially aware that the expansion pads correspond to the specifications laid down in
the installation plan.
Special attention shall be paid to the dimensions, the installation and also the trench enlargement to allow branches
and or expansion legs to move as expected.
The actual value of the expansions and other important pipeline dimensions shall be determined prior to backfilling.
The pipeline position, thickness and length of expansion pads shall be checked to ensure that they conform to the
installation plan.