[3] Garrad Hassan (2003) ‘Impacts of Increased Levels of Wind Penetration on the Electricity Systems of the
Republic of Ireland and Northern Ireland: Final Report’, a report commissioned by Commission for
Energy Regulation in Republic of Ireland OFREG Northern Ireland; available at http://www.cer.ie/
cerdocs/cer03024.pdf.
[4] Dragoon, K., Milligan, M. (2003) ‘Assessing Wind Integration Costs with Dispatch Models: A Case
Study’, paper presented at AWEA Windpower 2003 Conference, May 2003, Austin, TX; available at
http://www.nrel.gov/publications/.
[5] ILEX (2003) ‘Quantifying the System Costs of Additional Renewables in 2020’, a report commissioned by
the UK Department of Trade and Industry: available at http://www2.dti.gov.uk/energy/developep/
support.shtml 14.3.2003.
[6] Ensslin, C., Hoppe-Kilpper, M., Rohrig, K. (2000) ‘Wind Power Integration in Power Plant Scheduling
Schemes’, European Wind Energy Conference (EWEC) Special Topic, Kassel, Germany. SEE [37]
[7] Ernst, B. (1999) ‘Analysis of Wind Power Ancillary Services Characteristics with German 250 MW Wind
Data’, NREL Report TP-500-26969, available at http://www.nrel.gov/publications/.
[8] Ernst, B., Wan, Y.-H., Kirby, B. (2000) ‘Short-term Power Fluctuation of Wind Turbines: Analyzing
Data from the German 250 MW Measurement Program from the Ancillary Services Viewpoint’, in
Proceedings of the German Wind Energy Conference DEWEK 2000, 7–8 June 2000, Wilhelmshaven,
Germany, Deutsches Windenergie Institut, pp. 125–128.
[9] Focken, U., Lange, M., Waldl, H.-P. (2001) ‘Previento – A Wind Power Prediction System with an
Innovative Upscaling Algorithm’, in Proceedings of European Wind Energy Conference, 2nd–6th July,
2001, Copenhagen, WIP-Munich, Germany, pp. 826–829.
[10] Giebel, G. (2000) ‘Equalizing Effects of the Wind Energy Production in Northern Europe Determined
from Reanalysis Data’, Riso
¨
-R-1182(EN), Roskilde, available at http://www.risoe.dk/rispubl/index.htm.
[11] Giebel, G., (2001) On the Benefits of Distributed Generation of Wind Energy in Europe, VDI Verlag,
Du
¨
sseldorf, available at http://www.drgiebel.de/thesis.htm.
[12] Grubb, M. J. (1991) ‘The Integration of Renewable Energy Sources’, Energy Policy (September 1991)
670–689.
[13] Hirst, E. (2002) ‘Integrating Wind Output with Bulk Power Operations and Wholesale Electricity
Markets’, Wind Energy 5 19–36.
[14] Hirvonen, R. (2000) ‘Material for Course S-18.113 Sa
¨
hko
¨
energiaja
¨
rjestelma
¨
t’, Power Systems Labora-
tory, Helsinki University of Technology, Helsinki (in Finnish).
[15] Holttinen, H. (2003) Hourly Wind Power Variations and their Impact on the Nordic Power System
Operation, licenciate’s thesis, Helsinki University of Technology, 2003; available at http://www.vtt.fi/
renewables/windenergy/windinenergysystems.htm.
[16] Holttinen, H. (2004) ‘Optimal Market for Wind Power’, Energy Policy (in press).
[17] Holttinen, H., Tuhkanen, S. (2004) ‘The Effect of Wind Power on CO
2
Abatement in the Nordic
Countries’, Energy Policy 32(14) 1639–1652.
[18] Hudson, R., Kirby, B., Wan, Y. H. (2001) ‘Regulation Requirements for Wind Generation Facilities’, in
Proceedings of AWEA Windpower ’01 Conference, 3–7 June 2001, Washington, DC, American Wind
Energy Association (AWEA).
[19] Hurley, T., Watson, R. (2002) ‘An Assessment of the Expected Variability and Load Following Cap-
ability of a Large Penetration of Wind Power in Ireland’, in Proceedings of Global Wind Power Conference
Paris, 2–5 April 2002.
[20] ISET (Institut fu
¨
r Solare Energieversorgungstechnik) (2002) ‘Wind Energy Report Germany’, ISET,
Kassel, Germany.
[21] Kirby, B., Hirst, E. (2000) ‘Customer-specific Metrics for the Regulation and Load Following Ancillary
Services’, Oak Ridge National Laboratory, Oak Ridge, TN, USA.
[22] Kirby, B., Milligan, M., Hawkins, D., Makarov, Y., Jackson, K., Shui, H. (2003) ‘California Renewable
Portfolio Standard Renewable Generation Integration Cost Analysis, Phase I’, available at http://
cwec.ucdavis.edu/rpsintegration/.
[23] Krau, S., Lafrance, G., Lafond, L. (2002) ‘Large Scale Wind Farm Integration: A Comparison with a
Traditional Hydro Option’, in Proceedings of the Global Wind Power Conference, Paris, 2–5 April 2002.
[24] Kristoffersen, J R., Christiansen, P., Hedevang, A. (2002) ‘The Wind Farm Main Controller and the
Remote Control System in the Horns Rev Offshore Wind Farm’, in Proceedings of the Global Wind Power
Conference, Paris, 2–5 April 2002.